An extra layer of design coordination
J-MOD Studio ncorporates these requirements into the design brief, develops the layout around them and documents the relevant dimensions and details. The aim is to create a practical home whose accessibility features work together.
What does Platinum-Level design involve?
- Step-free access Plan the approach to the entrance and access to at least one bedroom and bathroom on the entry level, alongside the applicable parking and site- access requirements.
- Doorways and corridors Provide the specified 900 mm clear door openings and 1200 mm corridor widths, together with the required approach and door circulation spaces.
- Bedroom circulation In the accessible bedroom, allow a 1540 mm × 2070 mm clearance beside the bed on the door-approach side, with 1000 mm clearance on the remaining sides.
- Two-bedroom accommodation Allow at least 11 m², excluding wardrobes, for each bedroom in a two-bedroom Platinum dwelling, while also meeting the relevant width and circulation requirements.
- Bathroom usability Coordinate toilet, basin and shower circulation spaces, grab rails, wall reinforcement, fixture heights and floor drainage. The specified shower includes a minimum 1160 mm × 1100 mm area and a 1600 mm × 1400 mm clearance in front.
- Accessible kitchen planning Incorporate 850 mm-high benches, 1550 mm circulation clearances and the specified removable cabinet sections beneath the sink and cooktop.
- Laundry access Provide the relevant circulation spaces, including 1550 mm in front of fixed benches and appliances where the specified laundry arrangement applies.
- Furnished living spaces Maintain the required paths around furniture and provide a2250 mm wheelchair turning circle, subject to the guideline’s stated allowance.
- Reach and operation Coordinate switches, handles, windows, storage and fittings so their location and operation support the intended accessibility outcome.
These are selected examples, rather than a complete compliance checklist. The full design must address all applicable requirements in the project brief, technical sheets and specifications.
Making Platinum requirements work with modular construction
Modular construction introduces another set of design decisions.
Module widths, structural framing, transport constraints and connection points must be coordinated with the space residents need. A structural post at a module junction, for example, can affect a doorway approach. A floor connection can affect a threshold. Bathroom drainage must work with the modular floor structure.
J-MOD Studio develops the home layout and module arrangement together, coordinating design information with the nominated manufacturer, engineers and relevant consultants.
Accessibility therefore becomes part of the modular design from the outset. It informs where the modules join, how rooms connect and how the completed home meets the ground.
The same capability for conventional homes
For private homeowners, Platinum-Level social housing requirements can also provide a detailed design benchmark where that scope is agreed.
From design intent to a completed home
J-MOD Studio’s service can include site-responsive planning, requirement checks, detailed layouts, consultant coordination and drawings for assessment and construction within the agreed scope.
Final compliance depends on the applicable requirements, specialist input, assessment and completed construction. The guideline edition and project requirements are confirmed at commencement.
Choose the construction method that suits your project. Design the home around the people who will live in it.
Contact J-MOD Studio at info@jmod.com.au to discuss a two-bedroom modular or conventional home designed around Platinum-Level requirements.